In 2016, SPLOST funds have made nearly 16 miles worth of full depth reclamation projects possible:

Location Miles
Mt Carmel Road#1 from Welcome Road to Payton Road 4.137
Mt Carmel Road#2 from Hewlet South Road to Coggins Road 1.265
Turkey Creek Road* from pavement joint to pavement joint 0.645
Howard Road** from SR 16 to pavement joint 0.341
Howard Road** from pavement joint* to Senoia City Limit 0.092
Standing Rock Road#1 from Browns Crossing to Senoia City Limit 2.650
Standing Rock Road#2 from Senoia City Limit to Stallings Road 0.460
West Grantville Road from Grantville City Limit to Grady Smith Street*** 0.890
Lowery Road from Grantville City Limit to U.S. 29 0.590
4th Street #1 from Newnan City Limits to Boone Drive 0.790
4th Street#2 from Belk Road to Newnan City Limits 0.226
Michaels Crossing from SR154 to Cul-de-sac 0.241
Golden Ct. from Cherish Way to Cul-de-sac 0.100
Cherish Way from Michaels Crossing to Cul-de-sac 0.147
Cherub Lane from Michaels Crossing to Cul-de-sac 0.218
French Village Blvd. from Palmetto/Tyrone Road to French Village Blvd. 1.225
Trangueray Street from French Village Blvd. to Cul-de-sac 0.240
Belleview Ridge from French Village Blvd. to Cul-de-sac 0.193
Summit Lane from Mission Drive to Cul-de-sac 0.150
Mission Drive from Hwy 70 to Cul-de-sac 0.250
General Longstreet Lane from Baker Road to Cul-de-sac 0.447
Bradley Court from Happy Valley Circle to Cul-de-sac 0.300
TOTAL MILES 15.597

*Pavement joints are located approximately 200 linier feet south of East Newnan Road and approximately 500 linier feet West of Newnan Crossing Bypass.

** A portion of Howard Road is currently under construction for realignment and pipe replacement. Pavement joints will be located on each end of the realignment project at SR 16 and the Senoia City Limits.

*** End construction is approximately 50 feet past the intersection with Grady Smith Street.

Projects include Full Depth Reclamation (FDR), striping and markers.