SPLOST ROAD REHABILITATION – LATE SUMMER 2016

17.45 miles of road rehabilitation

2.209 miles of shoulder work

Funding possible by citizen support of the Special Purpose Local Option Sales Tax

CRACK RELIEF
protects existing pavement structures from water damage and delays reflective cracking in new surfaces therefore extending the life of the roadway
Millard Farmer Road from Corinth to Old Corinth 2.755
Christopher Road from SR54 to McIntosh Trail 2.613
Johnson Road from SR54 to Sid Hunter Road 1.143
Hood Road from SR70 to Brimer Road 1.485
DOUBLE SURFACE TREATMENT
pavement surfacing construction involving two applications of asphalt binder material and mineral aggregate. The emulsion is applied by a pressure distributor, followed immediately by an application of mineral aggregate, and finished by rolling. The result is an improved roadway at a lesser cost allowing more roads to be rehabilitated with available funds
Martin Girls Road from Thomas Powers Road to Heard County Line 2.211 miles
Newton Road from Macedonia Road to Old Carrollton Road 1.587 miles
Tabby Lynch Road from Martin Mill Road to Gordon Road 1.450 miles
Copeland Road from Adcock Road to Dead End 0.994 mile
Haynes Road from US27 Alt to Dead End 1.140 miles
Rainwater Road from Gordon Road to Dead End 0.892 mile
Coggin Road from Mt. Carmel Road to Dead End/td> 1.180 miles
SHOULDER PAVING AND SLOPE CONSTRUCTION
Raymond Hill Road from SR154 to Fischer Road 2.209 miles